\In 2024, JWB Civil Engineering carried out a thorough ground investigation at Cork Airport for DAA International. This work helped support the development of a new building by providing valuable insights into the soil conditions and identifying the best foundation solutions for the structure.
Our team closely collaborated with Scantech, who carried out advanced geotechnical testing and surveying. Their expertise allowed us to gather important data, enabling us to design foundations that prioritised stability and safety.
We completed the project with precision and professionalism, demonstrating our ability to deliver customised ground investigation solutions for complex developments.
Scroll down to see more images from our Cork Airport ground investigation project.
At JWB Civil Engineering, we recently completed a large piling project for Amgen, one of the world’s largest biotechnology companies. This project took place at their Amgen Dún Laoghaire (ADL) facility. ADL required a solution for an instability problem in the wall/embankment surrounding the premises. After assessing the site, we determined that foundation reinforcement services, including Ischebeck piles, would offer the best long-term solution for stability.
Why Foundation Reinforcement Was Needed
The embankment around the ADL premises had experienced significant movement. This raised concerns over the safety and stability of the surrounding structures. Foundation reinforcement strengthens existing foundations to support the load and withstand pressure. In this project, we used soil nailing, piling, and other reinforcement techniques to stabilize the structure. Specifically, Ischebeck piles were chosen for their strength and durability, ideal for embankment stabilization.
Our Approach: Piling and Foundation Reinforcement
To restore stability, we employed Ischebeck piling techniques. These piles provide exceptional support for foundations. By strategically placing them, we reinforced the embankment and prevented further movement.
As part of our foundation reinforcement services, we also conducted thorough ground investigations. This ensured the soil was suitable for piling. It was an essential step for ensuring the long-term stability of the structure. We worked closely with Amgen to provide the most efficient solution for the site.
Completed Project
The Amgen Dún Laoghaire project was completed in February 2024. Our team’s expertise in foundation reinforcement services allowed us to resolve the instability issue. As a result, the embankment and surrounding structures are now safe and secure.
You can scroll down to view some additional images of the work in progress as well as the completed works.
Why Choose JWB Civil Engineering for Your Foundation Reinforcement Needs?
At JWB Civil Engineering, we specialize in foundation reinforcement services. Whether you’re dealing with subsidence, soil instability, or need additional support for embankments, our team can help. For example, learn more about our piling services and how they play a key role in foundation reinforcement. We also offer subsidence solutions for properties facing ground movement issues.
Additionally, for more details on this project and to explore our other work, visit our Project Gallery, which showcases some of our successful foundation reinforcement and piling projects.
In December 2023, JWB Civil Engineering delivered a tailored stability solution for a private residence in Bishopstown, Cork. The property was showing clear signs of subsidence, including visible wall cracks and uneven floors. As a result, our team carried out a full site inspection and structural assessment. We decided that Mini Piling using Ischebeck bars would offer the best repair option.
Why We Used Mini Piling
Mini Piling strengthens foundations in weak ground conditions or where access is tight. Unlike traditional piling, it works well in confined areas and causes minimal disruption. Ischebeck bars provide high load capacity and long-lasting durability. Consequently, this combination offers a strong and reliable solution for foundation repairs.
How We Completed the Work
We worked in challenging site conditions; however, we maintained precision at every stage. Our engineers installed each pile to exact specifications and checked the alignment throughout the process. As a result, the foundation became stronger, further movement stopped, and the structure gained long-term stability.
Spotting the Signs of Subsidence
We repair many subsidence and instability issues across Ireland every year. For example, common warning signs include wall cracks, sticking doors, and sloping floors. If you spot these issues, act quickly. Our engineers can inspect your property, find the cause, and design a Mini Piling plan that fits your needs.
Learn More About Mini Piling
To learn more about the technical aspects of Mini Piling and other foundation solutions, you can visit the Institution of Civil Engineers or the Building Research Establishment for industry guidance. For a broader overview of how ground conditions and soil mechanics influence construction stability, the Geotechnical Engineering page offers a clear introduction.
Contact Us
If you have concerns about your property’s stability, contact us today for expert advice and a no-obligation assessment.
In August 2023, JWB Civil Engineering completed a significant ground stabilisation project for Christian Brother’s College, Cork. The site featured a large embankment that required reinforcement to ensure long-term safety and stability. The design for the works came from DL Consultant Engineers, Ballincollig.
Choosing the Right Stabilisation Method
After careful site assessment, our team selected soil nailing as the most effective solution. This technique involves inserting steel bars (nails) into the soil at regular intervals. The nails are then grouted into place, creating a reinforced mass that resists movement. This method is especially effective for steep slopes and retaining structures where traditional retaining walls may not be practical.
Benefits of Soil Nailing
Soil nailing offers several advantages:
Minimal excavation required, reducing disruption
Strong, long-lasting slope stability
Cost-effective compared to alternative retaining systems
Adaptable to a wide range of soil and rock conditions
In this case, the process strengthened the embankment without altering the appearance of the surrounding landscape. As a result, the school grounds remain safe for students and staff while maintaining their natural look.
Working with Experts
At JWB Civil Engineering, we deliver ground stabilisation and slope reinforcement projects across Ireland. Our expertise includes piling, retaining walls, and soil reinforcement. You can learn more about these techniques from the Institution of Civil Engineers or by visiting our Piling Page.
Get in Touch
If you’re dealing with unstable ground, erosion issues, or retaining wall failures, our engineers can provide a full site assessment and recommend the best stabilisation method for your needs. Contact us today for a no-obligation consultation.
JWB Civil Engineering completed a large soil nailing & slope stabilisation project in Macroom, Cork.
In 2022, JWB Engineering successfully undertook the challenging task of soil nailing and slope stabilisation. This project demanded meticulous planning and precise execution, and our expertise shone through every phase of the process. The innovative techniques and advanced methodologies employed by our team demonstrated our commitment to delivering high-quality results.
Please visit our Piling Page to read more about stabilisation, piling and other projects.
To view a selection of our past projects please visit the Project Gallery page.
JWB Civil Engineering recently solved a household subsidence issue in Ahakista, Bantry, Cork. The private residence in question had subsided, due to foundation issues. We stabilised the extension using traditional underpinning. Both the JWB and the client were extremely pleased with the outcome. You can view before and after images of the property below, by dragging the arrow.
If you observe any indications of subsidence, like cracks or uneven floors, we can thoroughly assess the situation and develop a decisive plan to fix the problem. Please contact us to request a quote for subsidence repair today.
Please visit our Subsidence Page to read more about house subsidence and sinkage.
JWB Engineering completed a rock armouring job for Cumnor Construction and Waterloo Residents Association in mid-2021. We stabilised the embankment along the river to ensure the Waterloo walkway would be safe for users.
Please scroll down to view an image of the site before and after the project.